In order all necessary hardware equipment to perform safe and efficient, ambient should be designed with correct materials for substructure projects of system rooms. Floor, ceiling and wall applications affects directly to working conditions of planned systems in systems room. Fire resistant partition walls and wall platings, false ceiling and floor installations, paint, plaster and sealing applications are performed within the frame of Project regulations.
1 Raised floors
2 Electrical power systems and power boards
3 Datacentercabinet systems
4 Fire detection systems
5 Gas extinguishing fire systems
6 Precision-controlled air-conditioning systems(HPAC)
7 Fire resistant doors and wall applications
8 Electronic security systems
9 Access control systems for system rooms